Back to Plugins
admin

Daily Field Reports

an alternative to Procore ($10,000+/yr) and Fieldwire ($3,588-7,188/yr) field report modules with a focused Claude plugin for small and mid-size general contractors

Plugin ID

pf-daily-log

Category

admin

Version

v1.2

Downloads

57
Try Online

pf-daily-log v1.1 — Superintendent Daily Field Reports

An alternative to Procore and Fieldwire field report modules with a focused Claude plugin for small and mid-size general contractors.

Installation

  1. Download the pf-daily-log.plugin file
  2. Open Claude Desktop and navigate to Settings > Plugins
  3. Click Install Plugin and select the downloaded .plugin file
  4. The plugin will be installed and available immediately

Note: All data stays local on your machine. No external API calls or cloud storage required.

What It Does

  • Capture daily field logs via freeform notes or structured JSON import
  • Generate professional DOCX daily field reports (weather, crew, work, materials, equipment, safety, visitors, delays, photos, legal disclaimer)
  • Rollup daily logs into weekly progress summaries
  • Track log streaks, missing entries, and project timeline progress

Quick Start

  1. Setup: Run /daily-setup to initialize your project workspace
  2. Log daily: Run /daily-log to capture field notes (freeform — just talk)
  3. Generate: Run /daily-generate to create a DOCX report
  4. Weekly rollup: Run /daily-weekly once you have a week of logs
  5. Dashboard: Run /daily-status to see your log streak and project summary

Commands

Command Description
/daily-setup Initialize project workspace (run once)
/daily-log Capture today's field log (freeform)
/daily-log-import Import a structured daily log JSON
/daily-generate Generate DOCX report for a log entry
/daily-batch-generate Generate DOCX for all pending logs
/daily-weekly Generate weekly progress summary
/daily-daily-log-dashboard Interactive visual dashboard — "show me"
/daily-status Show project dashboard
/daily-archive Move completed logs to archive/
/daily-kb Look up construction documentation standards

Folder Structure

project-folder/
├── inbound/              # Captured daily logs (JSON)
├── processing/           # Processed records (JSON metadata)
├── outbound/             # Generated reports (DOCX)
├── archive/
│   └── inbound/          # Archived completed logs
├── .daily/               # Plugin state and config schema
├── templates/            # Document templates and JSON schema
└── project.json          # Project configuration

Report Sections

Each daily field report includes:

  • Project header (GC name, project number, date)
  • Weather & conditions
  • Crew summary (by trade)
  • Work completed today (bulleted list)
  • Materials received
  • Equipment on site
  • Safety & incidents
  • Visitors & inspections
  • Delays & issues (with cause classification)
  • Photo log
  • Notes & open items
  • Legal disclaimer footer

AI-Powered Features

  • Log Synthesis: Converts freeform field note entries into structured daily logs with automatic categorization of weather, crew, work, and safety information
  • Report Generation: Creates professional DOCX daily field reports with proper formatting, crew summaries by trade, and material/equipment tracking
  • Delay Classification: Classifies delays per AGC ConsensusDocs 200 §6.3 (excusable-compensable, excusable-non-compensable, inexcusable) with AIA A201-2017 §8.3 notice tracking
  • Weekly Rollup Summarization: Synthesizes multiple daily logs into comprehensive weekly progress summaries with OSHA safety trending and delay accumulation by contractual category
  • Crew Analysis: Extracts and organizes crew information by trade with Davis-Bacon prevailing wage field support (DOL Form WH-347) for federally funded projects
  • Project Dashboard: Generates status dashboards showing log completion streaks, OSHA incident counts by classification, delay accumulation, and SWPPP compliance status
  • OSHA Safety Classification: Automatically classifies safety incidents as recordable, first-aid, or near-miss per OSHA 29 CFR 1904.7, with OSHA-reportable event flagging per §1904.39
  • Environmental Compliance Tracking: Captures SWPPP inspection data, BMP conditions, and spill events per EPA Construction General Permit (40 CFR 122.26) for NPDES-permitted sites
  • Weather Delay Assessment: Evaluates weather delays against objective thresholds from OSHA §1926.1417 (crane wind), ACI 306R (cold weather concrete), and NOAA Local Climatological Data
  • Centralized Knowledge Base: References authoritative construction standards (OSHA 29 CFR 1904/1926, AIA A201-2017, AGC ConsensusDocs 200, Davis-Bacon Act, EPA CGP, CSI MasterFormat) across all skills
  • CSI MasterFormat Categorization: Groups work-in-place by CSI division for traceability to Schedule of Values and AIA G702/G703 pay applications
  • Contract Notice Tracking: Flags delays requiring written notice per AIA A201-2017 §8.3.2 (21-day deadline) to prevent waiver of contractor entitlements

Feature Comparison

Feature pf-daily-log Procore Fieldwire Buildertrend
Freeform note capture ✅ AI-powered ❌ Form-only ❌ Form-only ❌ Form-only
OSHA incident classification ✅ 29 CFR 1904.7 ✅ Basic
Delay classification (AGC/AIA) ✅ Three-category taxonomy ✅ Basic categories
Davis-Bacon crew tracking ✅ DOL WH-347 fields ✅ Add-on module
SWPPP/stormwater compliance ✅ EPA CGP tracking ✅ Add-on
CSI MasterFormat coding ✅ Division-level ✅ Cost code integration
Contract notice tracking ✅ AIA A201 §8.3 flags
Weather delay thresholds ✅ OSHA/ACI/NOAA refs
Weekly TRIR estimate ✅ Auto-calculated ✅ Safety module
Annual cost Included with Claude $10,000+ $3,588-7,188 $4,788+

Estimated Cost per Use

Disclaimer: Token estimates are approximate and based on typical usage patterns measured from skill prompt sizes. Actual costs vary with input data size, conversation length, and complexity. Estimates use Claude Sonnet 4.6 pricing ($3/1M input, $15/1M output). Cowork and Claude Desktop subscription users (Pro/Max/Team) are not charged per-token — these estimates apply only to direct Anthropic API usage. Running stages individually in fresh sessions uses fewer input tokens than running the full pipeline sequentially, because pipeline mode accumulates conversation history across stages.

Per skill (run individually in a fresh session):

Stage Skill Prompt User Input Total Input Output Est. Cost
field-reports-crew-log ~4.4K ~800 ~8.3K ~6.0K ~$0.11
daily-capture ~3.3K ~800 ~6.9K ~3.3K ~$0.07
daily-dashboard ~3.1K ~500 ~6.4K ~8.0K ~$0.14
daily-generate ~1.9K ~800 ~5.3K ~6.0K ~$0.11
daily-kb ~4.6K ~800 ~8.1K ~4.6K ~$0.09
field-reports-delay-doc ~4.9K ~800 ~8.8K ~6.0K ~$0.12
daily-weekly ~1.6K ~800 ~5.0K ~3.0K ~$0.06
Standalone total ~48.8K ~36.9K ~$0.70

Full pipeline (all stages in one session — context accumulates):

Stage Base Input + History Total Input Output Est. Cost
field-reports-crew-log ~8.2K 0 ~8.2K ~6.0K ~$0.11
daily-capture ~7.1K ~6.8K ~13.9K ~3.3K ~$0.09
daily-dashboard ~6.6K ~10.9K ~17.4K ~8.0K ~$0.17
daily-generate ~5.7K ~19.4K ~25.1K ~6.0K ~$0.17
daily-kb ~8.4K ~26.2K ~34.6K ~4.6K ~$0.17
field-reports-delay-doc ~8.7K ~31.6K ~40.3K ~6.0K ~$0.21
daily-weekly ~5.4K ~38.4K ~43.7K ~3.0K ~$0.18
Pipeline total ~183.2K ~36.9K ~$1.10

Running the full pipeline once typically costs $0.77–$1.43 in API tokens (Claude Sonnet 4.6).

Known Limitations

  1. No photo embedding: Photos are logged by filename and description only — user must attach actual photos separately to the DOCX or email
  2. No blueprint/plan reading: Claude cannot read CAD files or blueprints; location descriptions must be provided in text notes
  3. No live weather API: Weather conditions must be entered by the superintendent — Claude does not fetch weather data automatically
  4. Not an official AIA document: Reports use AIA-adjacent formatting but are NOT licensed AIA contract documents; a legal disclaimer is included on every report
  5. No RFI/submittal integration: RFI and submittal tracking must be managed in a separate system; reference by number in notes only
  6. Single project per workspace: One project.json per folder; for multiple projects, use separate workspace folders

Pricing Comparison

Tool Annual Cost What You Pay For
Procore $10,000+/yr Full construction PM platform
Fieldwire $3,588-7,188/yr Field management platform
Buildertrend $4,788+/yr Full project management suite
pf-daily-log Included with Claude Focused daily field report tool

Requirements

  • Python 3.8+
  • python-docx (auto-installed on first run)
  • docx2txt (auto-installed on first run)

Important Disclaimers

  • AI-Generated Content: This plugin uses AI (LLM) technology which can produce inaccurate or incomplete outputs. All content should be treated as a starting point and reviewed for accuracy before use.
  • Not Professional Advice: Outputs do not constitute legal, financial, tax, medical, or other professional advice. Consult qualified professionals before making decisions based on generated content.
  • No Compliance Guarantee: References to industry standards, regulations, or guidelines are for informational purposes only. This plugin does not guarantee compliance with any law or regulation. Users are responsible for verifying all outputs meet their specific regulatory requirements.
  • No Endorsement or Affiliation: Mention of third-party products, standards, or organizations does not imply endorsement, partnership, or certification by those entities.

Ready to use Daily Field Reports?

Download this free plugin and start using it in Claude today.

Need something different?

We build custom plugins tailored to your exact workflow.

Request a Custom Plugin